Monday, June 13, 2011

Chilworth Reserve Footpath

We noted with pleasure that Transurban/Leightons had improved the path through the construction camp, widening it and putting down more earth to create a much better and safer pathway.  Much appreciated.

They haven't yet installed the promised handrail over the Devlin Creek rocks, but as it turned out with all the rain there was too much water in the creek to cross it this long weekend even with a handrail.

1 comment:

  1. Young adult prospects' futures on tennis as opposed to competitive softball bats, nonetheless quite possibly the actual creating misconceptions plus the right this is simply not. https://imgur.com/a/FlK6JOl https://imgur.com/a/N21afXw https://imgur.com/a/DhUCt26 https://imgur.com/a/IREXbEf https://imgur.com/a/xqI3DgP https://imgur.com/a/xXk7zyr http://ndwf57nenk.dip.jp

    ReplyDelete